Tunnel Projects for Menghua Railway:The Longest Heavy Haul Railway in China
万方数据知识服务平台
应用市场
我的应用
会员HOT
万方期刊
×

点击收藏,不怕下次找不到~

@万方数据
会员HOT

期刊专题

Tunnel Projects for Menghua Railway:The Longest Heavy Haul Railway in China

引用
1 Engineering significanceThe Menghua Railway from west Inner Mongolia to Central China is a major infrastructure for coal transportation in the 12th Five-Year Plan of China.The railway starts from Haolebaoji South Station and ends at Ji”an Railway Station of Beijing-Kowloon Railway,via Inner Mongolia,Shaanxi,Shanxi,Henan,Hubei,Hunan and Jiangxi,passing through 7 provinces and 17 municipalities,with a total length of 1 814.5 km and a design speed of 120 km/h.The Menghua Railway is Grade Ⅰ heavy haul national railway and the longest heavy haul railway built in one time in China,with the planned annual capacity of more than 200 million tons.

37

2018-03-15(万方平台首次上网日期,不代表论文的发表时间)

共7页

1627-1633

相关文献
评论
暂无封面信息
查看本期封面目录

隧道建设(中英文)

1672-741X

41-1355/U

37

2017,37(12)

相关作者
相关机构

专业内容知识聚合服务平台

国家重点研发计划“现代服务业共性关键技术研发及应用示范”重点专项“4.8专业内容知识聚合服务技术研发与创新服务示范”

国家重点研发计划资助 课题编号:2019YFB1406304
National Key R&D Program of China Grant No. 2019YFB1406304

©天津万方数据有限公司 津ICP备20003920号-1

信息网络传播视听节目许可证 许可证号:0108284

网络出版服务许可证:(总)网出证(京)字096号

违法和不良信息举报电话:4000115888    举报邮箱:problem@wanfangdata.com.cn

举报专区:https://www.12377.cn/

客服邮箱:op@wanfangdata.com.cn