10.3969/j.issn.1005-5339.2001.02.011
阿姆斯特丹港的PARAGON码头
@@ The Paragon Terminal constructed by CERES Terminal and Stevedores Inc. of the USA will be completed in July 2001. This dock-type terminal (or to be called indented berth, or slip berth)can enable simultaneous handling of containers on both the portside and the starboard side of a huge container ship. Therefore it can suit the container transport development in this new century.
阿姆斯特丹、container transport
F5(交通运输经济)
2007-04-29(万方平台首次上网日期,不代表论文的发表时间)
共3页
30-32