FIDIC"现场进入权条款"的权利义务表达
Conditions of Contract for Construction, FIDIC, 1999现场进入权条款(2.1 Right of Access to the Site)对FIDIC权利义务的表达如下.
2.1 Right of Access to the Site
The Employer 1 shall give the Contractor right of access to, and possession of, all parts of the Site within the time (or times) stated in the Appendix to Tender.